old forge hill

(New Windsor, NY) This project was a 4 dual port station installed at a condo complex. We installed 2 dual port stations at 2 separate locations on the premises. We installed a new service off the utility pole, installed a new panel, and ran conduit from the panel to each charger location. We trenched, poured, and formed concrete bases, and installed protective bollards. We performed this job for Livingston Energy Group, located in Schenectady, NY.